Cairn University Athletic Complex
The Cairn University Project has been an enjoyable one for the Benchmark team. The scope of work was slightly different than our typical projects. We teamed up with Worthington Davis Associates in the summer of 2021 to break ground and remove the existing Cairn sports fields. The school now has a new synthetic turf soccer field with a grandstand, along with a new baseball and softball field. The complex system of flat panel drains, trench drains and Infiltration Bed that Benchmark installed underneath each one of the fields will give the students the ability to play in all weather conditions.
Cairn 11
Cairn 5